ChiddingfoldNews May 19, 2011 Home
Music Contacts
Archive Whats-on
Tipteerers
Updated June 27, 2011
August 8, 2011
Saturday May 14 Hindhead A3 Tunnel Walk
http://www.bbc.co.uk/news/uk-england-13399930
Fascinating Facts
- The scheme design was presented in 4000 drawings
- 737 000 cubic meters of earth were excavated during construction of the project
- The tunnel excavators drank 528 gallons of low sulphur diesel each day
- It took 290 875 man-hours to dig the tunnel
- 289 460 cubic meters of concrete were made in our batching plant to construct the tunnel
- We worked a total of 1 399 034 man hours without an accident
- There are 156 miles of cables in the tunnel alone
- The lights in the tunnel are twice as bright as those at Old Trafford football stadium
- There are 104 CCTV cameras in the tunnel
- The fire main tank can hold 38 000 liters of water. This is the equivalent of 1 603 375 cups of tea
- 124 presentations on the scheme have been given to 8794 members of the public
- 4322 people have worked on the project